Saturday, September 06, 2008
Tailcone AD from Van's
Van's has found some cracking on a bulkhead in the tailcone of their RV-10. As a result, they have issued a mandatory AD which will require the removal of the empannege and disassembly of the rear tailcone. They have supplied some reinforcing doublers and a package of rivits. I will start the repairs Monday Sept 8th.
The aircraft now has about 95 hours on it and it is performing flawlessly. I took it to Oshkosh and on to London Ontario this summer
The aircraft now has about 95 hours on it and it is performing flawlessly. I took it to Oshkosh and on to London Ontario this summer