14 Jul 2011, VE7DSN, Frank, was asked to chair a group to plan and coordinate the finishing of the SD69 Emcomms Communications Trailer. These pages will ultimately become the working documentation for the trailer.


Index of Assemblies and Plans

The files listed below are randomly ordered. Who can be sure of the build sequence?
[ Go to the top of this document ]


Resources

Here are links to documents and sites that facilitates the project

Greg's [ Communications Trailer ] concept sketch

Written [ Trailer Specifications ] in .TXT format

[ Radio Wi Fi Project ] as a Powerpoint

[ Go to the top of this document ]


Details

[ Go to the top of this document ]


Notes

This area is for noting issues that arise as the project develops.

                  Some considerations - Project Flow

 - Selection of development team
        Dave     - will assist
        Tom      - will assist
        Lawrence - will assist
        Sid      - will assist
        ????     -

 - Document in HTML as it can display most electronic formats we likely need

   - Permits 'tree linked' pages so that no single page becomes too complex

   - Accepts many graphic formats, even handsketches, scanned into the system
   - - scanned image file - hand drawn images - a 3" x 5" file displays well
   - - Cad files          - Submit as a screen capture, GIF or JPG
   - - Photographs        - Submit as JPG
   - - Documents          - Submit as PDF files

   - Automatically builds the trailer documentation package

 - Publish on VE7DMN's or Frank's server as not directly, a 'MIRA' matter
   17 Jul - Found out how to FTP to Frank's server, so that should be OK
   if Frank's host allocates sufficient web space.

 - Must await delivery of trailer to see what we actually get!


 - Provide a clear process for planning and installing assemblies to the trailer
   ( See 'Status' below )

 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 


Below is a list of items identified as needed in the completed trailer.
items may be added or removed as circumstance evolves.


Items required from Yahoo Group File   
  
ORCA EMERGNENCY COMMUNICATIONS TRAILER.doc

2 operating positions
Storage cabinets
Generator – 1-3 KW
Battery charger
Portable light stands
100 foot extension cord(s)
Awning
Propane tank
Galley equipment, 2-way fridge, 2-burner propane stove
12 volt batteries
12 volt solar panel
12/110 volt inverter
Jack stands (4)
Ground bar
Grounding plate and cable
12 volt distribution system
110 volt distribution system
Roof vent or AC heating/cooling
Antenna systems
Outside monitor speakers
First aid kit

 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 

Additional Items

From Yahoo Groups File - Trailer Ideas.txt


Fold down map table
Dutch Door
open shelving space above operator stations
under counter task lighting
Porta Potty

 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Items noted from Yahoo Groups file -  

  Greg's [ Communications Trailer ] concept sketch

At time of writing all items on the sketch have been accounted for in the
above lists.


 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -



[ Go to the top of this document ]


Status

This area outlines the 'status' of the project. What has to be done next; concerns to be dealt with etc.

  1. - Committee cues the assembly for incorporation into the trailer -

  2. - Committee reviews the suitability of the assembly's location and design -

     - VE7AJN, XLH, DSN, VA7EPC, ZA viewed and accepted that the trailer was substantially complete
                   - Concerns noted:
                     - Cove corners - difficult to fit panelling
                     - Self tapping screws yet to be acquired
                     - Aluminum mast - a heavy, unstable lift! 
  3. - Committee presents conclusions to Emcomms Group for ratification -

  4. - Committee assigns individual(s) to build and fit assembly -

     - VE7EPC to sign off on Trailer 
  5. - Committee reviews the status of assemblies, redirecting as needed -