Preparing for the next stand.
The motorman is wrapping the chain onto the pipe in the rotary table.
One roughneck is putting dope on the thread of the pipe.
The other roughneck is waiting for the next stand of pipe to be picked up
when he will guide the pipe so that the driller can lower it into the last stand.