|
AA Truck Project - Body Mounting March 12/05 - Report by Glenn Smith The AA truck body to frame re-assembly
session went quite well on Saturday March 12, with eight willing workers
in attendence. Our temporary cowl assembly, with fuel system and
ignition was removed to allow for the installation of the body components.
Under the direction of our in-house technical expert (Murray Walkemeyer)
we commenced the initial fitting of the fenders, splash pans and running
boards. After establishing a game plan on lifting the body into
place on the frame, and taking on a little refreshment, it was time to make the move. A few holes had to
be re-drilled in the body which had inadvertently been welded closed at
the body shop when the floor was repaired. Considerable amount of
work is still required on the truck, which will allow our club
members a chance to
|